Office location: 919 North Main Street, Mooresville NC, 28115
10/14/2022
Greg Jones
Port Washington, OH
Had installed in 2020 and hasn't worked yet. And we understood that we was getting a backup generator. So we are paying for a dead horse. Also was told by contractors that we needed a panel upgrade on our fusebox but the boss looked at pictures and said we didn't
System size (kW): 30
Year installed: 2020