08/18/2023
Marie S
Beaumont, CA
It has been almost a year since I signed up for a new system install (September 2022). They have not been able to complete the permitting process, or provide an install date, an ETA, or even assign me a project manager that is willing/able to return calls or make more than a quarterly attempt to keep me in the loop (out of the 5 I have had assigned to our project so far). I was told in January of 2023 that the permits were submitted to and being reviewed by my local municipality. On July 13th 2023 I was told that the permits were submitted to and being reviewed by my local municipality. Today I received an eSign document from Sunpower asking me to sign a termination agreement, which I did not request, nor can anyone at Seabright explain why I received it. If they are cancelling the contract after keeping us hanging for almost 1 year, the loss of NEM 2.0 grandfathering is going to cost us a significant amount of money, if solar is even a viable choice at that point. I am still in shock at how completely nonexistent the customer service is with this company, given the amount of money involved. They simply do not care once your contract is signed.
System size (kW): 13.28
Year installed: 2023