09/14/2023
Panama Ed
Sun City West, AZ
Good experience from the first contact with Matt followed by an efficient (despite the heat) and careful installation. They provided helpful information and answered questions. The only delay to production was the wait for the county inspection and the new APS meter. With only 15 days of production in late August (temperatures all over 110) my bill was almost 35% lower than what it would have been without solar.
System size (kW): 4.86
Year installed: 2023