09/18/2023
StanKo
Grand Junction, CO
Communication was consistent and reliable. System was installed within 10 days of schedule. Inspection was done the day after. OK! xcel energy took about six weeks to put the required meter in. Big Dog Solar and I regularly bugged Xcel. System up and running production a little low, perhaps weather?
System size (kW): 3.8
System price: $13,500
Year installed: 2023
Price include the Federal Tax Credit or incentives: No