Office location: 7 McKee Pl, Cheshire CT, 06410
03/08/2025
Roger A. Dilliber
Seymour, CT
Trinity started the process in September 2024. The next step was a home evaluation to show corrections that would prevent heat loss, and other problems. The next step was they had to secure permits from the town, and approval from our local electric company. The next step was the panel installation. I must say that everyone that I encountered was very polite and knowledgeable. Then we had the final inspection of the installation whch passed with flying colors. Two weeks later we were turned on. I have seen a steady decrease in my regular electric bills, from over $200.00 dollars per month To my February bill of $33.00, and that was for the winter months. I can only emagine what the bills will be during the summer months with all the sun. I am very pleased.
System size (kW): 5637
Year installed: 2025